Part-number driven sourcing for distributors and repair networks

Wiring Harnesses & Electrical Components

Engine and body wiring harnesses, high-output and remanufactured alternators, starter motors, ignition coils and battery cable harnesses — crimped and loomed in-house, continuity-tested 100% and validated to OE specification.

Showing 9 of 720+ SKUs in this category. Use filters to narrow.

Looking for a part not shown? Send us your part number or OE reference.

Submit Part List

Wiring & electrical components we manufacture

Driventus builds automotive electrical assemblies for aftermarket and OE programs. Every wiring harness is crimped, loomed and 100% continuity-tested; every alternator and starter is load-bench validated before packing. Request our 2026 catalog for application data and OE cross-references.

Wiring harnesses

Engine, body and universal wiring harnesses with OE-grade connectors, tinned-copper conductors and abrasion-resistant loom, built to drawing or sample.

Alternators

High-output and remanufactured alternators with new bearings and regulators, load-tested across the rev range.

Starters & ignition coils

Gear-reduction starter motors and molded ignition coil packs, endurance-cycled for reliable cold starts.

Battery cables

Heavy-gauge battery cable harnesses with crimped, sealed terminals for low resistance and corrosion resistance.

Related categories

Engine Components  ·  Brake System  ·  Suspension & Control Arm  ·  Wheel Hub & Axle  ·  Exhaust System  ·  Mirrors & Body  ·  All Categories  ·  OEM / ODM