Part-number driven sourcing for distributors and repair networks
Wiring & Electrical · In Stock

Starter Motor

SKU: DV-ELE-STM-159

  • Product FamilyStarter Motor
  • MaterialTinned copper conductor, OE connectors
  • ApplicationPassenger & commercial
  • Surface / FinishAbrasion-resistant loom
  • OE Cross-ReferenceMatched to your part number on request
  • Quality SystemIATF 16949 · ISO 9001 · REACH · RoHS
  • CustomizationPrivate label · custom packaging · OEM drawing
MOQ200 pcs
Lead Time25 days
IncotermsFOB · CIF · DDP
Request a Quote Request Free Sample
Part NumberDV-ELE-STM-159
Product FamilyStarter Motor
Material GradeTinned copper conductor, OE connectors
ApplicationPassenger & commercial
Surface TreatmentAbrasion-resistant loom
Manufacturing StandardISO 6722 / USCAR
Validated Operating Temp−40 °C to 125 °C
Quality SystemIATF 16949 · ISO 9001:2015
Country of OriginChina (Taizhou, Zhejiang)

Driventus matches OE and aftermarket cross-references to your part number or a physical sample. Send your reference in the form below and our engineering team returns a verified cross-reference list within 24 business hours.

European OEsVW/Audi · BMW · Mercedes-Benz · PSA · Renault — on request
Asian OEsToyota · Honda · Nissan · Hyundai/KIA · Mazda — on request
American OEsGM · Ford · Stellantis — on request
Aftermarket BrandsCross-referenced to major aftermarket catalogs

All trademarks belong to their respective owners; cross-references are for fitment comparison only.

Inner PackagingNeutral box / blister per piece, foam-protected
Master CartonMulti-piece export carton, reinforced
Pallet ConfigurationEuro pallet (1200×800), stretch-wrapped
Private LabelYour logo, multi-language inserts, custom barcode
Anti-CounterfeitOptional holographic seal & QR verification
Standard Lead Time25 days for stock · 25–35 days for custom OEM
Sample Lead Time3–7 days (free for stock items)
Loading PortFOB Ningbo (default) · Shanghai & Qingdao available
Sea / Air FreightFCL, LCL via Maersk/MSC/COSCO · DHL/FedEx/UPS for samples
DocumentationCommercial Invoice, Packing List, B/L, CO, FA, MSDS
Standard Warranty12 months from B/L date or 30,000 km, whichever first
Defect Rate Commitment≤0.5% — verified by independent buyer testing
Returns ProcessRMA within 48 hours · root-cause report within 7 days
OEM ProgramsCustom warranty terms negotiable per program
Get a Quote

Inquire about DV-ELE-STM-159

Tell us your target volume, arrival market and any custom-packaging requirements. Our export sales team responds within 24 business hours with pricing, MOQ confirmation and lead time.

  • 24-hour quote turnaround
  • Free samples for stock SKUs
  • OE cross-reference verification included
  • Private-label and custom packaging available
Please enter your name
Please enter your company
Please enter a valid email
Please enter your country
Please describe your inquiry

By submitting, you agree to our privacy policy. We never sell or share inquiry data.

Related Products

Other Wiring & Electrical parts buyers frequently source alongside DV-ELE-STM-159.