Part-number driven sourcing for distributors and repair networks

Control Arms & Suspension Components

Lower and upper control arms, suspension ball joints, tie rod ends, stabilizer links, coil springs, shocks and struts — forged and stamped in-house, machined on our CNC centers and fatigue-tested to OE specification.

Showing 9 of 1150+ SKUs in this category. Use filters to narrow.

Looking for a part not shown? Send us your part number or OE reference.

Submit Part List

Suspension & control arm components we manufacture

Driventus supplies the full steering and suspension hardware range to aftermarket distributors and OE programs. Every control arm, ball joint and link is forged or stamped from controlled-grade steel, CNC-machined and fatigue-tested before packing. Request our 2026 catalog for the complete fitment list and OE cross-references.

Control arms

Lower and upper control arms in stamped and forged steel, supplied bare or pre-assembled with ball joint and bushings to match OE part numbers.

Ball joints & tie rod ends

Forged ball joints and tie rod ends with hardened studs and sealed boots, greased for life and salt-spray tested for export.

Sway bar links & springs

Stabilizer sway bar links and cold-wound coil springs, powder-coated for corrosion resistance and rate-matched to OE.

Shock absorbers & struts

Twin-tube and gas shock absorbers and complete strut assemblies, dyno-tested for consistent damping across temperature.

Related categories

Engine Components  ·  Brake System  ·  Wheel Hub & Axle  ·  Exhaust System  ·  Wiring & Electrical  ·  Mirrors & Body  ·  All Categories  ·  OEM / ODM