Part-number driven sourcing for distributors and repair networks

Brake System Components

Brake rotors, drums, ceramic and semi-metallic pads, brake discs, calipers, master cylinders and stainless brake lines — cast and forged in-house, machined on our CNC centers, and noise- and runout-tested to OE specification for B2B buyers worldwide.

Showing 9 of 980+ SKUs in this category. Use filters to narrow.

Looking for a part not shown? Send us your part number or OE reference.

Submit Part List

Brake system components we manufacture

Driventus is a vertically integrated Chinese manufacturer supplying the full brake hardware range to aftermarket distributors, jobbers and OE programs. Every brake rotor, drum and disc is cast from controlled-graphite grey iron, CNC-machined and runout-checked, then balance- and noise-tested before packing. Below is an overview of each sub-category — request our 2026 catalog for the complete fitment list and OE cross-references.

Brake rotors & brake discs

Vented and solid brake rotors plus drilled-and-slotted performance brake discs in grey cast iron and carbon-ceramic. Machined to sub-0.04 mm lateral runout with anti-corrosion geomet coating available for export shipping.

Brake drums

Passenger and heavy-duty truck brake drums, as-cast or fully machined, with balanced wall thickness for even wear and reduced fade under load.

Brake pads & shoes

Ceramic and semi-metallic brake pads and riveted/bonded brake shoe sets, shimmed and chamfered for low noise, supplied with wear sensors and hardware kits to match OE part numbers.

Calipers, master cylinders & brake lines

Remanufactured and new floating brake calipers, cast-iron brake master cylinders, and DOT-compliant stainless steel braided brake lines and repair kits — pressure-tested to 1.5× working pressure.

Related categories

Engine Components  ·  All Product Categories  ·  OEM / ODM Services  ·  Quality & Testing