Part-number driven sourcing for distributors and repair networks

Mirrors, Bumpers & Body Panels

Power and manual side mirrors, front and rear bumper covers, grilles, headlight assemblies and stamped body panels — injection-molded and pressed to OE contours, fit-checked on master fixtures for clean panel gaps.

Showing 9 of 910+ SKUs in this category. Use filters to narrow.

Looking for a part not shown? Send us your part number or OE reference.

Submit Part List

Mirrors & body components we manufacture

Driventus tools and molds collision and body parts for the aftermarket. Every side mirror, bumper and panel is injection-molded or pressed to OE contours and fit-checked on master fixtures before packing. Request our 2026 catalog for application data and OE cross-references.

Side mirrors

Power, manual and towing side mirror assemblies with heated glass and signal options, motor-cycled and matched to OE plug-and-play connectors.

Bumpers & grilles

Injection-molded front and rear bumper covers and grilles, contour-matched for tight panel gaps and ready for paint.

Headlights

DOT/ECE headlight assemblies with clear lenses and precise beam patterns, vibration- and moisture-tested.

Body panels

Stamped steel fenders and hood panels with anti-corrosion e-coat, dimensionally verified on CMM fixtures.

Related categories

Engine Components  ·  Brake System  ·  Suspension & Control Arm  ·  Wheel Hub & Axle  ·  Exhaust System  ·  Wiring & Electrical  ·  All Categories  ·  OEM / ODM