Part-number driven sourcing for distributors and repair networks

Industries We Serve

Five demanding industries trust our components to keep their fleets, fields and factories running. Each comes with its own duty cycle, environment and certification — and we build to all of them.

Five Verticals, One Manufacturing Standard

From a city sedan to a 40-tonne tractor — the same OE-spec quality

Whatever the application, we tune the metallurgy, surface finish and tolerance band to the duty cycle. A piston for a stop-start hybrid is built differently from one for a 16-hour-day agricultural diesel. Our R&D team understands the difference.

Passenger car industry

Passenger Car Aftermarket

OE-equivalent components for European, Japanese, Korean and American passenger car platforms.

  • Engine rebuild kits
  • Timing component sets
  • Cooling system parts
  • Fuel system service parts
Commercial truck

Commercial Truck & Bus

Heavy-duty engine components engineered for long-haul, high-mileage diesel duty cycles.

  • Cylinder liners (wet & dry)
  • Heavy-duty pistons
  • Crankshaft assemblies
  • Valve train components
Marine industry

Marine

Corrosion-resistant components for inboard, outboard and small commercial vessel engines.

  • Marine-grade pistons
  • Salt-water-rated seals
  • Cooling system components
  • Custom OEM marine parts
Agricultural

Agricultural Machinery

High-load components for tractors, harvesters and irrigation pumps — built for dust and long shifts.

  • Heavy-duty cylinder liners
  • High-compression pistons
  • Wear-resistant valve sets
  • Long-life gasket kits
Industrial machinery

Industrial Machinery

Engine and powertrain parts for generators, compressors, forklifts and construction equipment.

  • Industrial-grade pistons
  • Generator engine kits
  • Forklift engine components
  • Custom OEM programs
Performance and motorsport

Performance & Motorsport

Forged, balanced and surface-treated components for tuning houses and racing teams.

  • Forged performance pistons
  • H-beam connecting rods
  • Nitrided crankshafts
  • Custom OEM tuning parts
Buyer Profiles

Three buyer types — three ways we work together

Buyer Type A

Aftermarket Distributors

Regional and national distributors selling to repair shops and parts retailers. We supply with your private label, MOQ from 200 sets, FOB or CIF terms.

  • Private packaging
  • Volume rebates
  • Stock SKUs available in 15 days
Buyer Type B

OEM & Tier-1 Suppliers

Vehicle and engine OEMs and their Tier-1 partners requiring custom-engineered parts with full PPAP documentation and SPC reporting.

  • Custom engineering
  • PPAP / FA documentation
  • Long-term capacity reservation
Buyer Type C

Repair Chains & Service Networks

Multi-location service businesses sourcing direct to bypass distributor markup. We deliver to your central warehouse on your schedule.

  • Direct factory price
  • Multi-region delivery
  • Tailored SKU bundles

Active Buyers in 60+ Countries

From Stuttgart to São Paulo — here are the markets we ship to most frequently.

Europe
Germany United Kingdom France Italy Spain Netherlands Belgium Poland Czechia Sweden Denmark Norway
Americas
United States Canada Mexico Brazil Argentina Chile Colombia Peru
MENA, Africa & Oceania
UAE Saudi Arabia Egypt Turkey South Africa Australia New Zealand Russia

Looking for a partner in your industry?

Whichever vertical you're in, we have engineers and account managers who already speak your application. Tell us what you need.