Part-number driven sourcing for distributors and repair networks

Cooling System Components

Aluminium radiators, thermostats, electric cooling fans, radiator hoses, oil coolers and coolant expansion tanks — brazed and assembled in-house, then pressure- and thermal-cycle tested to OE specification.

Showing 9 of 560+ SKUs in this category. Use filters to narrow.

Looking for a part not shown? Send us your part number or OE reference.

Submit Part List

Cooling system components we manufacture

Driventus brazes and assembles the full engine-cooling range for aftermarket distributors and OE programs. Every radiator, thermostat and fan is leak-, pressure- and thermal-cycle tested before packing. Request our 2026 catalog for the complete fitment list and OE cross-references.

Radiators & heater cores

Brazed aluminium radiators and heater cores with high-fin-density cores and nylon/plastic tanks, leak- and pressure-tested to OE spec.

Thermostats & housings

Wax-element thermostats and integrated thermostat housings with precise opening temperatures and OE-matched seals.

Cooling fans & shrouds

Electric cooling fans and complete fan shroud assemblies, motor-cycled for airflow and noise.

Hoses, oil coolers & expansion tanks

Reinforced EPDM radiator hoses, stacked-plate oil coolers and pressure-rated coolant expansion tanks, burst- and thermal-cycle tested.

Related categories

Engine Components  ·  Brake System  ·  Water Pump  ·  All Categories  ·  OEM / ODM