Part-number driven sourcing for distributors and repair networks

Exhaust Systems — Pipes, Cat-Back & Mufflers

Mandrel-bent exhaust pipes, cat-back and axle-back systems, performance mufflers, catalytic converters and cast manifolds — TIG-welded from 304 and 409 stainless steel, flow-bench checked and pressure-tested to OE specification.

Showing 9 of 640+ SKUs in this category. Use filters to narrow.

Looking for a part not shown? Send us your part number or OE reference.

Submit Part List

Exhaust system components we manufacture

Driventus fabricates complete exhaust hardware for aftermarket distributors and performance brands. Every exhaust pipe, muffler and cat-back system is mandrel-bent and TIG-welded from stainless steel, then leak- and flow-tested before packing. Request our 2026 catalog for fitment data and OE cross-references.

Exhaust pipes & tailpipes

Mandrel-bent exhaust pipes, intermediate sections and polished tailpipe tips in 409 and 304 stainless for smooth flow and long corrosion life.

Cat-back & axle-back systems

Bolt-on cat-back exhaust and axle-back exhaust systems with matched mufflers and clamps, dyno-tuned for sound and flow.

Mufflers & resonators

Straight-through and chambered mufflers and resonators in 304 stainless for performance and OE-replacement fitments.

Catalytic converters & manifolds

EPA/Euro-spec catalytic converters and cast-iron exhaust manifolds, pressure-tested and emissions-validated.

Related categories

Engine Components  ·  Brake System  ·  Suspension & Control Arm  ·  Wheel Hub & Axle  ·  Wiring & Electrical  ·  Mirrors & Body  ·  All Categories  ·  OEM / ODM