Part-number driven sourcing for distributors and repair networks

Wheel Hubs, Bearings & Axle Components

Front and rear wheel hub assemblies, sealed wheel bearings, CV axle shafts, CV joints and drive shafts — precision-machined from bearing steel, ABS-encoder matched, and run-out and noise tested to OE specification.

Showing 9 of 870+ SKUs in this category. Use filters to narrow.

Looking for a part not shown? Send us your part number or OE reference.

Submit Part List

Wheel hub & axle components we manufacture

Driventus machines precision rotating hardware for the global aftermarket. Every wheel hub, bearing and CV joint is ground from bearing-grade steel, heat-treated and run-out and noise tested before packing. Request our 2026 catalog for the complete fitment list and OE cross-references.

Wheel hubs & hub bearing units

Front and rear wheel hub assemblies and integrated hub bearing units with ABS encoder rings, machined to sub-0.025 mm run-out.

Wheel bearings

Sealed double-row wheel bearings and complete kits with hardware, greased and tested for low noise and long service life.

CV axles & CV joints

Splined CV axle shafts and outer/inner CV joints with durable boots, balanced to reduce vibration.

Drive shafts

Balanced steel drive shafts with universal joints for passenger and light commercial applications.

Related categories

Engine Components  ·  Brake System  ·  Suspension & Control Arm  ·  Exhaust System  ·  Wiring & Electrical  ·  Mirrors & Body  ·  All Categories  ·  OEM / ODM