Part-number driven sourcing for distributors and repair networks

Custom Manufacturing for Tier-1 & Private-Label Buyers

From your drawing — or a sample we reverse-engineer — to first article in as little as 11 weeks. NDA protected, fully documented, ready for serial production.

OEM & ODM Capabilities

Two ways to source custom parts from us

OEM: You provide the drawing, specification or a sample. We quote tooling, validate first articles, document the FA package, and run serial production at your target volume.

ODM: You describe the application and target cost. Our 22-engineer R&D team designs the part, validates with FEA, prototypes in-house, and delivers an OE-grade solution branded for you.

Either way: full NDA, traceable manufacturing, IATF 16949 quality records, and your own private packaging if you want it.

  • 22 mechanical engineers (SolidWorks, ANSYS, AutoCAD)
  • In-house tooling shop — no outsourcing of critical molds
  • Prototype lead time: 14-21 days
  • First-article documentation: PPAP-style FA report
  • Production capacity: 500-5,000 units/month per SKU
Engineering team
Our OEM Process

From inquiry to serial production — typical 11 weeks

1

NDA & Brief

Sign mutual NDA. Receive drawings, samples or specifications. Engineering review.

2

Quote & DFM

Tooling & unit cost quote with design-for-manufacturing recommendations within 5 days.

3

Tooling & Prototype

Build molds and machining fixtures. Deliver 5-20 prototype samples in 3-4 weeks.

4

First Article & PPAP

Full dimensional + material + functional test report. Buyer approves before serial production.

5

Serial Production

Manufacturing per agreed schedule with weekly progress photos and SPC data.

6

OQC & Documents

Outgoing quality control with COC, FA, batch records — packed per spec.

7

Shipping

FCL, LCL, air or rail. Customs documentation handled. Insurance arranged on request.

8

Ongoing Support

Lifetime engineering support, ECO management, second-source assistance if required.

What You Get

The deliverables behind every OEM program

Engineering Drawings

Detailed 2D/3D files in your preferred format — DWG, STEP, IGES, PDF.

FA / PPAP Report

Material certificate, dimensional layout, hardness, tensile, all critical CpK data.

Custom Packaging

Your logo, multi-language inserts, barcodes, anti-counterfeit seals if needed.

NDA & IP Protection

Mutual NDA standard. Tooling owned by you on request, with secure storage logs.

Production SPC Data

Statistical process control charts shared monthly — full transparency on every lot.

Compliance Pack

REACH, RoHS, MSDS, CE — all documents tied to your part number and lot.

Recent OEM Programs

What we've built for our buyers

(Buyer names anonymised per NDA. We can share references on request and with their permission.)

Cylinder liner program
EU Tier-1

Custom Wet Liner for German Truck OEM

Reverse-engineered from a 25-year-old service part. Delivered first article in 11 weeks; serial production at 1,800 units/month.

Piston program
US Aftermarket

Forged Piston for Performance Brand

Designed from scratch with our R&D team. Coated skirt, custom dome. Now sold under buyer's brand in 14 US states.

Water pump program
UK Distributor

Private-Label Water Pump Range

27-SKU water pump catalog manufactured under buyer's private label, with custom packaging and UK-specific compliance inserts.

Start Your Custom Program

Have a drawing, sample or RFQ?

For heavy-duty diesel programs, use our technical specifications and RFQ checklist to prepare part references and validation requirements.

Send it under NDA. We'll respond within 3 business days with a tooling quote, lead time and a clear development plan.

Start an OEM Inquiry Review Our Quality System