dual mass flywheel · 2026-06-20

Dual Mass Flywheel Peugeot OEM Supplier Guide

A dual mass flywheel Peugeot OEM supplier has to do more than match a part number. Buyers need consistent metallurgy, torsional performance, controlled runout, and commercial terms that fit production or aftermarket demand. For Peugeot applications, the flywheel must match the engine’s torque profile, clutch interface, starter ring geometry, and crankshaft flange pattern. Driventus supplies dual mass flywheel programmes for B2B buyers that need documented quality control, cross-reference support, and export-ready logistics. Driventus is an independent aftermarket manufacturer; brand names are referenced for fitment only. We work to IATF 16949:2016 and ISO 9001:2015 systems, with material and compliance controls aligned to REACH (EC) No 1907/2006 where applicable. For procurement teams, the practical questions are MOQ, lead time, validation data, and whether the factory can support repeatable builds across OE 06A-style reference formats and other engine-family cross-references when supplied by the buyer.

Start with the failure modes, not the price

If a dual mass flywheel is wrong, the symptoms show up fast: idle rattle, launch shudder, clutch drag, premature bearing wear, or vibration that returns after a short service interval.

For Peugeot programmes, the first sourcing question is not "what is the cheapest equivalent?" It is "which failure mode are we preventing?" A part that looks dimensionally close can still miss the damping curve, spring preload, or inertia window needed for the engine and gearbox combination.

Use this order of checks before you ask for a quote:

  • Confirm engine code and gearbox family
  • Match the OE cross-reference supplied by the buyer
  • Verify clutch diameter, spline count, and starter ring tooth count
  • Check flange pattern, bolt circle, and installed height
  • Define torque capacity, angular deflection, and idle damping targets
  • State runout, end float, and parallelism limits

A strong specification package makes sourcing faster. A weak one creates returns, noise complaints, and endless comparison work. For buyers building out a range, see our catalog and engine components.

What should be on the Peugeot spec sheet

The right supplier will ask for the spec sheet before the price sheet. That is a good sign.

At minimum, a Peugeot dual mass flywheel request should cover the following:

</tr></thead><tbody> </tbody></table>For many programmes, buyers also want a target for rotational balance, a surface-finish requirement, and packaging notes for corrosion control. If the vehicle line includes both passenger and light-commercial duty, do not assume one internal spring set works across both. The external casting can be the same while the internal response is not.

Driventus is an independent aftermarket manufacturer; brand names are referenced for fitment only. We can review drawings, dimensions, and buyer-supplied references before quotation so the purchasing team does not have to resolve engineering issues after the order is placed.

Compare supplier claims against factory proof

Not every supplier that says "OEM quality" can prove it.

Use a simple comparison lens: claim, evidence, and repeatability. If the answer is only product photos and a sales promise, the risk is high.

Spec item Buyer should provide Why it matters
Engine codeVehicle or engine familyDefines torsional demand
Transmission typeManual gearbox referenceAffects clutch interface and starter engagement
OE referencePart number or cross-referenceAnchors fitment review
Friction-face diameterIn mmMust match clutch coverage
Spline countInput-shaft matchPrevents assembly mismatch
Bolt patternFlange geometryEnsures crank fitment
Mass and inertiaTarget valuesShapes damping behavior
Runout and parallelismTolerance bandReduces noise and drag

</tr></thead><tbody> </tbody></table>A dual mass flywheel Peugeot OEM supplier should be able to explain how the part is controlled from raw material to final packing. That means heat treatment records, hardness checks, balance data, and clear acceptance criteria. It also means the commercial team can tell you whether the same revision will be held across repeat orders.

If the supplier cannot describe how the part is measured, they probably cannot control variation either. Buyers can review our quality system before scheduling a supplier-qualification call.

Compare supplier claims against factory proof

How to qualify a source in five steps

A fast qualification process saves more time than a low quote ever will.

1. Send the OE cross-reference, engine code, and gearbox type. 2. Request a drawing review with all critical dimensions marked. 3. Ask for sample units and the associated inspection report. 4. Confirm validation targets: balance, runout, thermal behavior, and endurance. 5. Lock commercial terms: MOQ, lead time, packing, and revision control.

That sequence keeps engineering and purchasing aligned. It also prevents a common failure mode: the buyer approves a sample that fits, but the production batch arrives with different balance behavior or packaging that does not protect the ring gear.

For catalogue buyers, sample MOQ may be 1 to 2 pieces for fitment review, while pilot runs are often 20 to 50 pieces depending on tooling state. Standard production lead time is typically 35 to 55 days after order confirmation and deposit, though machining queue and material availability can extend that window. Ask for separate timing on samples, pilots, and mass production; bundled lead times are not useful for planning.

If your programme needs private-label packaging or controlled replenishment, keep revision stability in the agreement from the beginning. It is easier to hold a build standard than to renegotiate one later.

Validation data worth asking for

This is where good sourcing programs separate from generic ones.

Ask for the data that shows the flywheel will survive real duty, not just pass a visual check:

  • Static and rotational balance records
  • End float and angular deflection verification
  • Starter engagement check
  • Thermal cycling or exposure results
  • Noise, vibration, and harshness screening
  • Fatigue or endurance cycle data
  • Torque transfer curve at stated load points
  • Surface hardness and friction-face finish report

If the application is sensitive to heat checking, dust ingress, or corrosion, request the sealing and surface-treatment details too. For private-label or OEM-style programs, sample installation feedback and teardown inspection after endurance testing add real value.

Acceptance criteria should be written before shipment of the first sample set. Specify sample size, often 3 to 5 units from the first lot, plus rejection triggers such as balance deviation outside spec, visible heat marks, abnormal noise, or runout drift. That keeps engineering review objective and helps procurement avoid circular debate later.

For product families outside stock range, custom manufacturing can align tooling, tolerances, and packaging to the buyer’s specification.

What Driventus can do for sourcing teams

Driventus supports B2B buyers that need more than a catalog listing.

We operate as a vertically integrated manufacturer in Taizhou, Zhejiang, with machining, assembly, and inspection control in one supply chain. That setup helps reduce variation between approved samples and repeat production.

Typical support includes:

  • OE cross-reference review from customer-supplied numbers
  • Engineering drawing confirmation before quotation
  • Sample submission for fitment and dimensional review
  • Production planning for distributor, OEM, and repair-chain demand
  • Export documentation for international shipment
  • Lot-level inspection records and packing-list traceability
  • Packaging confirmation for sea freight, air freight, and mixed pallet shipments

We do not claim vehicle-manufacturer approval or endorsement. We focus on fitment, repeatability, and audit-ready documentation.

If you are sourcing a Peugeot dual mass flywheel programme and need a quotation, technical confirmation, or sample plan, use request a quote to send the reference, annual volume, target delivery schedule, and required tolerances.

Frequently asked questions

Yes, when the buyer provides the reference, engine code, and key dimensions. We validate the fitment data before quotation and confirm the production drawing revision before release.

We can provide quality-system information, dimensional records, material certificates, balance reports, and other programme-specific documents for buyer review. Final document sets depend on the part reference and commercial agreement.

Yes. We support custom manufacturing, packaging, controlled production runs, and release-by-release revision control for distributors, OEMs, and Tier-1 supply chains.

If you are sourcing a Peugeot dual mass flywheel programme and need a quotation, technical confirmation, or sample plan, send the reference details through /contact.html.

Request a Quote
Claim What to ask for Better answer looks like
OE-like fitmentDimensional drawing and revision controlMatching critical dimensions with traceable rev status
Stable qualityInspection reports and lot traceabilityRecords tied to each batch, not just sample pieces
Long service lifeTest summary and endurance dataTorque transfer, thermal, and fatigue evidence
Export readinessPacking and document setCarton labels, pallet details, and shipment paperwork
ComplianceMaterial and regulatory recordsREACH-aligned control where applicable