Engine Components · In Stock

Forged Aluminum Piston Kit — 78mm Bore

SKU: PD-PST-4C-001 · OE Cross-Reference: 06A107065, 030107081, 11251745899

  • Bore Diameter78.00 mm (±0.005)
  • Compression Height33.5 mm
  • Pin Diameter20 mm, floating
  • MaterialForged 2618 Aluminum Alloy
  • Surface TreatmentAnti-friction skirt coating
  • Ring Pack IncludedYes — 3-ring (1.2 / 1.2 / 2.0 mm)
  • Application1.6L 4-cylinder petrol engines (EU/JP)
  • CertificationIATF 16949, ISO 9001, REACH, RoHS
MOQ200 sets
Lead Time15 days
IncotermsFOB · CIF · DDP
Request a Quote Request Free Sample
Part NumberPD-PST-4C-001
Product FamilyForged Aluminum Pistons
Bore Diameter78.00 mm ±0.005
Compression Height33.5 mm
Pin Diameter20 mm (floating pin design)
Pin Length62.5 mm
Weight per Piston335 g
Material Grade2618 Aluminum Forging
Skirt CoatingMolybdenum disulfide (MoS₂) anti-friction
Ring PackPlasma top ring · taper-face 2nd · 3-piece oil
Compatible Compression Ratio9.5:1 to 11.0:1
Validated Operating Temp−40 °C to 180 °C
Volkswagen / Audi06A107065, 06A107065C, 06A107065E
BMW11251745899, 11251744925
Mercedes-BenzA2710300217, A2710300317
Toyota13101-22030, 13101-22031
Honda13030-PLM-A00
Nissan12010-EE000
Hyundai / KIA23410-23703, 23410-23711
Aftermarket EquivalentsMAHLE 030107081, KS 99757600, NPR 12345

Cross-references are provided for fitment comparison only. All trademarks belong to their respective owners.

Standard Inner BoxIndividual blister, 1 piston per blister with ring set
Master Carton20 sets per master carton (80 pistons)
Carton Dimensions520 × 380 × 320 mm
Gross Weight32 kg per master carton
Pallet Configuration20 cartons per Euro pallet (1200×800)
Container Loading20' FCL ≈ 2,800 sets · 40' HQ ≈ 6,200 sets
Private LabelAvailable — your logo, multi-language inserts, custom barcode
Anti-CounterfeitOptional holographic seal & QR code verification
Standard Lead Time15 days for stock SKUs · 25-35 days for custom OEM
Sample Lead Time3-7 days (free for stock items)
Production Capacity40,000 sets / month for this SKU family
Loading PortFOB Ningbo (default) · Shanghai & Qingdao available
Air FreightAvailable for samples and small urgent shipments (DHL, FedEx, UPS)
Sea FreightFCL, LCL via Maersk, MSC, COSCO, Hapag-Lloyd
DocumentationCommercial Invoice, Packing List, B/L, CO, FA, MSDS (where applicable)
Customs SupportEUR.1, Form A and Form B handled by our export team
Standard Warranty12 months from B/L date or 30,000 km, whichever first
Defect Rate Commitment≤0.5% — verified by independent buyer testing
Returns ProcessRMA issued within 48 hours · root-cause report within 7 days
ReplacementFree replacement or credit on next order for confirmed defects
OEM ProgramsCustom warranty terms negotiable per program
InsuranceFull marine insurance arranged on CIF/DDP terms
Get a Quote

Inquire about PD-PST-4C-001

Tell us your target volume, arrival market and any custom-packaging requirements. Our export sales team responds within 24 business hours with pricing, MOQ confirmation and lead time.

  • 24-hour quote turnaround
  • Free samples for stock SKUs
  • OEM cross-reference verification included
  • Private-label and custom packaging available
Please enter your name
Please enter your company
Please enter a valid email
Please enter your country
Please describe your inquiry

By submitting, you agree to our privacy policy. We never sell or share inquiry data.

Related Products

Customers who ordered PD-PST-4C-001 frequently bundle these parts.