Clutch Kit Dodge Manufacturer China: Sourcing Guide
For buyers searching for a clutch kit Dodge manufacturer China, the main decision points are fitment accuracy, consistent friction performance, and supply reliability. Driventus supplies clutch kits for B2B programmes where dimensional control, traceability, and repeatable packaging matter as much as unit price. Our production is based in Taizhou, Zhejiang, with export experience in 60+ countries and certified systems under IATF 16949:2016 and ISO 9001:2015. We support aftermarket distributors, wholesalers, OEM and Tier-1 buyers, and repair chain procurement teams.
Driventus is an independent aftermarket manufacturer; brand names are referenced for fitment only. Where a Dodge application is specified, buyers typically need a clutch cover, disc, release bearing, and alignment parts that match OE envelope dimensions and clamp-load targets. This article sets out the sourcing criteria buyers use when auditing factories, comparing lead times, and approving samples. It also explains where custom packaging, kitting, and material options can be adjusted for regional requirements.
What buyers should verify before sourcing
A clutch kit programme for Dodge applications should be assessed on measurable points, not catalogue claims. For procurement teams, the first checks are OE cross-reference accuracy, disc diameter, spline count, and hub offset. Next comes friction material, cover spring specification, and release bearing compatibility.
Core sourcing checks
- OE cross-reference confirmation, such as OE 06A107065 where applicable to the vehicle programme
- Disc outer diameter and spline profile match
- Clamp load and pedal effort balance
- Facing material type and heat resistance
- Runout, plate flatness, and assembly balance
- Packaging, labels, and traceability requirements
A supplier should provide dimensional drawings, sample inspection records, and a defined change-control process. For volume programmes, confirm whether the factory can hold the same bill of materials across production lots. If the part family extends to adjacent engine and transmission components, buyers can review our catalog for related product coverage.
Factory capability and certification matter
For international sourcing, certification is only useful when it is linked to process control. Driventus operates under IATF 16949:2016 and ISO 9001:2015. That matters because clutch kits rely on repeatable compression force, controlled friction liner bonding, and stable assembly torque.
What a factory audit should cover 1. Incoming inspection for steel stampings, facings, springs, and bearings 2. In-process checks for rivet height, cover cover-to-disc concentricity, and balance 3. Final inspection for packaging count, labels, and corrosion protection 4. Traceability from batch to shipment 5. Corrective action records and nonconformance handling
If your team needs supplier documents, PPAP-style data, or revised pack configurations, the quality system page explains our process controls. For buyers running private label or programme-specific engineering changes, custom manufacturing can cover packaging, kitting, and specification alignment.
Typical clutch kit specifications for Dodge programmes
Dodge-fit clutch kits vary by platform, transmission type, and duty cycle, but buyers usually compare the same technical fields across suppliers. A spec-first approach makes sourcing easier across the US, Canada, EU, UK, Australia, and Brazil.
| Spec item | What to confirm | Why it matters |
|---|---|---|
| Disc diameter | Match OE or validated equivalent | Affects torque capacity and pedal feel |
| Spline count | Match input shaft | Prevents fitment failure |
| Facing material | Organic, ceramic, or segmented hybrid | Defines heat tolerance and drivability |
| Cover type | Diaphragm spring design | Impacts clamp load and release effort |
| Release bearing | Bearing type and seal design | Reduces NVH and warranty risk |
| Flatness / runout | Controlled to drawing requirement | Reduces chatter and judder |
| Corrosion protection | Coating and storage method | Protects transit and shelf life |


